Photo Essay: Waste Disposal Sites around the Mullassery Canal
The following series of photos have been curated to describe the waste disposal issues around the competition site and within the Mullassery canal itself.
Participants may use these to supplement their readings of the design briefs.

Local birds against a backdrop of garbage

Accumulation of waste and silt in the Mullassery Canal

UDC Sub-site C - Municipal waste segregation ground

UDC Sub-site A - Mullassery Canal - flow obstructed by Railway tracks and pollution

UDC Sub-site A - Mullassery Canal - flow obstructed by Railway tracks and pollution

Drainage Pipe entering the canal waters

Storm water outlets into the Mullassery Canal

UDC Sub-site C - Waste accumulation in the Mullassery Canal

Drainage outlet into the Mullassery Canal

UDC Sub-site C - the western backwaters mouth of the Mullassery Canal

Storm water outlets into the Mullassery Canal

Accumulation of silt in the Mullassery Canal

UDC Sub-site A - Mullassery Canal - flow obstructed by Railway tracks and pollution

UDC Sub-site A - Mullassery Canal - flow obstructed by pollution

Accumulation of silt in the Mullassery Canal

Plastic waste drifting in the canal waters